8778 Tucker Blvd Cycle Track

The Tucker Boulevard Cycle Track Project will add a 2-way, street level, physically protected bike and scooter facility on the existing asphalt pavement along the west side of Tucker Boulevard between Washington Avenue and Chouteau Avenue. The project will also include elements that improve pedestrian safety and accessibility such as updated pedestrian signal heads, high visibility crosswalk markings, a mid-block median crosswalk refuge island at City Hall, and updated ADA curb ramps at select locations along the west side of Tucker. In addition, a new traffic signal is planned to replace the existing signal at the intersection of Tucker and Chouteau. This new signal will accommodate the cycle track, lane reconfiguration, curb ramps, and modified drainage at this intersection.
Date Company Contact
1729627006
10/22/24 7:56 pm
CENTURY BUILDING GROUP 5701 Southeast Ave.
St.Louis, MO 63136
Rod Johnson
Tel: 314-440-0437
Fax: 314-776-5500
1729678979
10/23/24 10:22 am
Crown Packaging Corporation 17854 Chesterfield Airport Road
Chesterfield, MO 63005
Jason Hoffmann
Tel: 8168689338
1729666073
10/23/24 6:47 am
Dodge Data & Analytics 2860 S State Hwy 161
Ste 160 #501
Grand Prairie, TX 75052
Jayalakshmi L
Tel: 413-376-7032
1730409467
10/31/24 9:17 pm
N/A 1467 Summerpoint Lane
Fenton, MO 63026
Justin Stange
N/A
Tel: 3146207437
1729526888
10/21/24 4:08 pm
Southern Illinois Builders Association 1468 Green Mount Road
O'Fallon, IL 62269
Stephanie Foster
Tel: 6186249055
Fax: 618-624-9065
1729526453
10/21/24 4:00 pm
Traffic Control Company 601 8th Street
Valley Park, MO 63088
Kim Clayman
Sales Account manager
Tel: 314-546-2566