SLCC, Forest Park Campus, EHC Renovation, Kitchen Equipment Package
Status
Accepting Bids
Bid Date | 11/26/24 4:00pm |
ST. LOUIS COMMUNITY COLLEGE will receive electronic bids for the Kitchen Equipment Package for Contract No. F25 402-A, Transformed Projects at the Forest Park Campus for the EHC Renovation, until November 26, 2024 at 4:00 p.m. local time CST.
Proposals MUST be submitted electronically to Travis Aly, Project Manager at tcaly@tarltoncorp.com on or before the time and date stipulated in the Request for Proposal (RFP) document. Specifications and drawings may be obtained from Cross Rhodes’ Plan room at 2731 S.Jefferson, St. Louis, MO 63118 – https://www.x-rhodes.com/sendfiles.php.
Documents are also available in Bonfire at https://stlcc.bonfirehub.com.
Questions regarding the scope of work should be directed to Travis Aly.
The College has the proposed minority goals MBE 15% and WBE 12%. Also proposed for Contractors to participate in a registered Apprenticeship Program approved through the United States Department of Labor.
Individuals with special needs as addressed by the Americans with Disabilities Act may contact 314-644-9039.
An Equal Opportunity and Affirmative Action Employer